Pre-Construction Phase

The most important aspect of any project is in the preparation

Having a complete understanding of a project before the Construction Phase commences is vital.

Identifying items in any works that are likely to cause difficulty and removing those items through engineering expertise, or minimising the impact of those items that cannot be engineered out, is imperative in ensuring that time and monetary factors are always under control.

Below are just some of the things that A&R Consultants can do for you:

  • Contract analysis and negotiation
  • Estimating – providing quotations, producing pricing templates
  • Health and safety information – preparation and evaluation
  • Licences – which are needed and obtaining them
  • Marketing – for specialist marketing and PR advice and support
  • Meetings – both on and off site. Arranging, attending and leading meetings with designers, clients, highways officials, council members, members of the public, press and all those involved in ensuring a project is completed successfully
  • Notifications
  • Phasing plans
  • Principle Designer
  • Programming
  • Project analysis – trouble shooting, identifying areas in a project that are likely to cause difficulty and removing or minimising those things that can’t be removed before works commence
  • Sub-contractor evaluation
  • Sub-contractor suitability and appointment
  • Technical analysis of – preliminary drawings. Stage 2 Safety Audits, geotechnical reports
  • Technical approval – what is needed and how to obtain it
  • Tenders – preparation, obtaining, evaluation and analysis
  • Traffic management plans – preparation, obtaining, evaluation and analysis

These are the main items necessary for a project; but all projects are unique and require an open-minded and adaptable approach because you really never do know what’s below the surface.

For further information contact A&R Consultants on: 01803 469 979 or info@aandr-civilengineering.co.uk

Frequently Asked Questions

What is a notifiable project under Construction Design Management (CDM)?
A construction project is notifiable if the construction work is expected to: last longer than 30 working days and have more than 20 workers working at the same time at any point in the project; or exceed 500 person days of construction work.
What notice period is needed for a temporary road closure?
Three months.
What notice period is needed for a Section 50 licence?
One month.
What is considered to be Minor Works?
Dropped kerbs for a single vehicular access. A simple bell mouth junction serving a private development that requires no amendment to street lighting, highway drainage system or horizontal and vertical alignment of the Adopted Highway.

Working On The Public Highway During The Summer Months

This is when things start to hot up in more ways than one! The first thing that needs to be looked at is whether or not construction work can be carried out on a particular road during the summer months. Many roads are covered by embargos which prohibits all works...

Meeting Future Civil Engineers At Torre Academy

A&R Consultants organised a careers fayre at Torre Church of England Academy for nearly 300 of its pupils on Friday 29th June 2018, supporting the school’s push to forge closer links with local businesses. Nearly a dozen local businesses attended the careers fayre...

10 Things To Check Before Carrying Out Works On The Public Highway!

1. How many occupations can you have before the S278 works are completed?  Suddenly being told that you can’t sell any more of your onsite properties until the completion of the S278 works can prove incredibly costly.  Check the S278/S106/S38 agreements carefully...

If you’re ready to see how we can help you with your next Civil Engineering project lets have a chat.

Testimonials

“Alex’s technical analysis of Geotechnical reports and understanding of what was required saved tens of thousands of pounds and weeks of additional works. His ability to hone in and identify problems as well as knowing how to overcome them is exceptional. I would definitely recommend him!”

Richard Brodie Quantity Surveyor
Places For People Ltd

“We have worked with Alex on many S278, S106 and S38 projects over the years. He has a complete understanding of how to bring a project from inception to completion. He has handled tricky projects with a calm and professional approach and has always completed on programme. We will definitely be working with him in the years to come.”

Jamie Binmore
Managing Director, Preston Plant Ltd

“I have used Alex on a number of contracts and his in-depth knowledge of what is required along with his professionalism have made him invaluable. I would highly recommend him!”

John Purdy
Director, Ilsham Interiors

“In the 6 years I’ve known Alex I have found him to be an excellent Construction Professional with integrity and high standards. Alex is a great team player that can always be relied on to deliver your project. I would highly recommend him!”

Simon Foster
Director, Trinity Safety Ltd

“Alex’s professional yet personable approach is excellent. He understands the difficulties posed by a project and has the flexibility to adapt to any issues that arise. Would highly recommend him.”

Andy Hoare
Senior Project Surveyor, Midas Group

"A&R Consultants' drive, dedication and commitment has been a great support to us as a school this year. They have planned, sourced and led a careers fayre for over 200 pupils and have also supported us in completing three bids for funding; as well as acting as Principal Designer in the planned construction of a Sensory Room and Garden. They have gone the extra mile and made it very easy for us. Both Alex and Rachael are reliable, trustworthy and hardworking - I cannot recommend them highly enough!"

Mrs S. Julyan
Headteacher at Torre C of E Academy

Engineering Insights by Alex

Working On The Public Highway During The Summer Months

This is when things start to hot up in more ways than one! The first thing that needs to be looked at is whether or not construction work can be carried out on a particular road during the summer months. Many roads are covered by embargos which prohibits all works...

Meeting Future Civil Engineers At Torre Academy

A&R Consultants organised a careers fayre at Torre Church of England Academy for nearly 300 of its pupils on Friday 29th June 2018, supporting the school’s push to forge closer links with local businesses. Nearly a dozen local businesses attended the careers fayre...

10 Things To Check Before Carrying Out Works On The Public Highway!

1. How many occupations can you have before the S278 works are completed?  Suddenly being told that you can’t sell any more of your onsite properties until the completion of the S278 works can prove incredibly costly.  Check the S278/S106/S38 agreements carefully...